Проект Сахалин I и Сахалин II

“Sakhalin I” and “Sakhalin II”

For the “Sakhalin II” project in 2003-2005 PJSC “NSRY” fabricated and installed main mechanical outfitting for drilling rigs (in a volume: Carbon Steel – 1250 tons, Stainless steel – 450 tons). Successful cooperation was continued with in the project “Sakhalin-I“ in 2008-2011. NSRY fabricated and installed the ballast system in a volume: Carbon Steel – […]

Read more